01
Endpoints
Build the port schedule
Give each link a stable label and record what it connects.
- List the device, room and physical port at both ends.
- Check connector format and polish, optical interface and assigned fibers.
- Flag live services and ports reserved for later use.
02
Route
Walk and measure the route
Trace each segment and transition with the intended installation method in mind.
- Check ducts, trays, risers, building entries and rack drops.
- Record measured lengths, access points, bend constraints and slack positions.
- Mark outdoor sections and places where the cable route will share space.
03
Termination
Detail the handoff points
Use the port schedule to specify the box, closure or panel at each handoff.
- Check mounting, entry sizes, adapter count and clear working space.
- Allow for splice trays, slack and breakout leads.
- Map polarity and record which side of the enclosure gives access to the ports.
04
Optical budget
Allow for losses along the link
Compare estimated link loss at the chosen wavelengths with the operating ranges of the selected interfaces.
- Record the operating limits used for the transmitter and receiver.
- Include connectors, splices, fiber length and passive optics.
- Check the highest and lowest expected losses with the intended operating margin.
05
Acceptance
Agree what the installer will hand over
Decide what must be inspected, measured and recorded before the work starts.
- Specify connector inspection and continuity and polarity checks.
- Agree on loss measurements and which links need OTDR traces.
- Specify the format for as-built routes, port records and test reports.
Review the gaps in the plan
Share the route, equipment or acceptance decisions that still need confirmation.